Construction location
Tübingen
Dimensions
Length 35 m, width 4.5 m
Design
Fully welded construction consisting of web and bulkhead plates as well as a carriageway plate made of 12 mm sheet steel with mastic asphalt.
Prefabrication
The bridge will be completely welded in the factory so that only the handrails have to be mounted on site.